People

Celebrities and Royals from around the world. Right on schedule.

News

Daily news and events, covered by our international photographers.

Features

Odd, funny and touchy images. Be amazed.

Styling

Fashion and design trends.

Portrait

Premium Portraiture.

Reportage

In-depth Coverage.

Creative

Selected stock imagery.

Dukas Bildagentur
request@dukas.ch
+41 44 298 50 00

Your search:

153 result(s) in 0.45 s

  • Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    DUKAS_181983944_EYE
    Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.

    Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

     

  • Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    DUKAS_181983953_EYE
    Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.

    Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

     

  • Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    DUKAS_181983938_EYE
    Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.

    Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

     

  • Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    DUKAS_181983947_EYE
    Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.

    Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

     

  • Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    DUKAS_181983941_EYE
    Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.

    Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

     

  • Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    DUKAS_181983950_EYE
    Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
    Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.

    Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    The Guardian

     

  • Kupiansk trembles as Russian forces close in again
    DUKAS_177213740_EYE
    Kupiansk trembles as Russian forces close in again
    Russia's apparent plan is to flatten then reoccupy the Ukrainian city, where the situation has become dramatically worse since the beginning of October.
    Russian combat units are now less than two miles from Kupiansk, Ukraine.

    In recent weeks, however, the Russians have been advancing. Across the frontline, Ukrainian defences are crumbling at the fastest rate since 2022.

    Oleksandr Ivantsov reassembles a drone in the warehouse where it is kept together with other tools

    Alessio Mamo / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

    Alessio Mamo

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068250_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068252_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068249_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068257_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068256_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068258_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068248_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • 'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    DUKAS_169068251_EYE
    'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
    Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.

    Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.

    Martin Paul repairs and restores violins in his Melbourne workshop. Australia.

    Ellen Smith / Guardian / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com (FOTO: DUKAS/EYEVINE)

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_010
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209b)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_009
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209p)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_008
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209d)
    NASA's Orion spacecraft sits on top of the SLS rocket as it rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_007
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209h)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_006
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209c)
    NASA's Orion spacecraft sits on top of the SLS rocket as it rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_005
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209i)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_004
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209r)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_003
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209q)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_002
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209k)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    DUK10149983_001
    NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
    Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209m)
    NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
    NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022

    (c) Dukas

     

  • FEATURE - Die schönste und grösste "goldene Halskette" der Welt
    DUK10146772_002
    FEATURE - Die schönste und grösste "goldene Halskette" der Welt
    Mandatory Credit: Photo by Sipa Asia/Shutterstock (12632648e)
    On December 2, 2021, Nanjing City, Jiangsu Province, the Zhongshan Scenic Area of ‚Ä‚ÄNanjing in the early winter season is full of forests, colorful and picturesque. From the air, the yellowed sycamore leaves on the cemetery road are like a string of Meiling Palace. "Golden Necklace" is so beautiful, ushering in the most beautiful viewing moment of the year.
    Viewed from the air through a drone, rows of platanus trees form a collar. The Meiling Palace in Xuanwu District of Nanjing is like a gem inlaid at the end of the necklace, quietly nestling at the foot of the Purple Mountain. There are folk rumors that the Meiling Palace was a "birthday gift" from Chiang Kai-shek to Soong Meiling. Netizens called this "the world's best necklace" as Jiang Gong's romantic confession to his beloved wife. It is understood that the trees forming the "necklace" on the cemetery road were not planted in the same period.
    According to records, the earliest construction budget of Meiling Palace was 260,000 silver dollars, but in the end it actually spent 320,000 silver dollars. The money was first advanced by the Army, Navy and Air Force Command, and later the Nanjing Municipal Finance Bureau also contributed part of the advance. The financial pit left by Meiling Palace for the two departments was finally filled by Chiang Kai-shek with the reimbursement of the total reserve fund of the state finance.

    Due to disrepair, Meiling Palace started repairs in December 2012 and was completed in September 2013. The rows of fatons are layered on top of each other, and the shape is like a necklace, which is very spectacular. Netizens called it "the most awesome necklace in the world." These necklace-shaped platanus trees were not planted at the same time. The Fatong that forms the "collar" on the cemetery avenue was planted during the construction of the Zhongshan Cemetery from 1925 to 1929, and the Fatong that formed a "pendant" ..

    (c) Dukas

     

  • FEATURE - Die schönste und grösste "goldene Halskette" der Welt
    DUK10146772_001
    FEATURE - Die schönste und grösste "goldene Halskette" der Welt
    Mandatory Credit: Photo by Sipa Asia/Shutterstock (12632648d)
    On December 2, 2021, Nanjing City, Jiangsu Province, the Zhongshan Scenic Area of ‚Ä‚ÄNanjing in the early winter season is full of forests, colorful and picturesque. From the air, the yellowed sycamore leaves on the cemetery road are like a string of Meiling Palace. "Golden Necklace" is so beautiful, ushering in the most beautiful viewing moment of the year.
    Viewed from the air through a drone, rows of platanus trees form a collar. The Meiling Palace in Xuanwu District of Nanjing is like a gem inlaid at the end of the necklace, quietly nestling at the foot of the Purple Mountain. There are folk rumors that the Meiling Palace was a "birthday gift" from Chiang Kai-shek to Soong Meiling. Netizens called this "the world's best necklace" as Jiang Gong's romantic confession to his beloved wife. It is understood that the trees forming the "necklace" on the cemetery road were not planted in the same period.
    According to records, the earliest construction budget of Meiling Palace was 260,000 silver dollars, but in the end it actually spent 320,000 silver dollars. The money was first advanced by the Army, Navy and Air Force Command, and later the Nanjing Municipal Finance Bureau also contributed part of the advance. The financial pit left by Meiling Palace for the two departments was finally filled by Chiang Kai-shek with the reimbursement of the total reserve fund of the state finance.

    Due to disrepair, Meiling Palace started repairs in December 2012 and was completed in September 2013. The rows of fatons are layered on top of each other, and the shape is like a necklace, which is very spectacular. Netizens called it "the most awesome necklace in the world." These necklace-shaped platanus trees were not planted at the same time. The Fatong that forms the "collar" on the cemetery avenue was planted during the construction of the Zhongshan Cemetery from 1925 to 1929, and the Fatong that formed a "pendant" ..

    (c) Dukas

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713299_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Walkers go around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713300_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Cyclists and walkers go around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713297_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A runner goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713275_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A cyclist goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713273_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A cyclist goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713295_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Pedestrians walk around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713276_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A cyclist stops at Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713315_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A cyclist stops at Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713296_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Hammersmith Bridge which crosses the River Thames in West London lays empty after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713272_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Hammersmith Bridge which crosses the River Thames in West London lays empty after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713294_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Hammersmith Bridge which crosses the River Thames in West London lays empty after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713274_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Rowers keep away from Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713303_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A Walk goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713302_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. A Walk goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    DUKAS_118713301_EYE
    Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
    14/08/2020. London, UK. Walkers go around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
    © Alex Lentati / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)

    © Alex Lentati / eyevine

     

  • NEWS - USA Unruhen: Geplünderte und verbarrikadierte Läden in New York
    DUK10132738_040
    NEWS - USA Unruhen: Geplünderte und verbarrikadierte Läden in New York
    Customers wait outside of Echelon Cycles in New York on Saturday, May 20, 2020.
    (c) Dukas

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245942_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
    Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245939_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
    Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245936_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
    Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245940_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
    Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245941_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245944_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
    Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    DUKAS_102245938_EYE
    Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
    A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.

    © Evening Standard / eyevine

    Contact eyevine for more information about using this image:
    T: +44 (0) 20 8709 8709
    E: info@eyevine.com
    http://www.eyevine.com
    (FOTO: DUKAS/EYEVINE)

    © Evening Standard / eyevine. All Rights Reserved.

     

  • Next page