People

Celebrities and Royals from around the world. Right on schedule.

News

Daily news and events, covered by our international photographers.

Features

Odd, funny and touchy images. Be amazed.

Styling

Fashion and design trends.

Portrait

Premium Portraiture.

Reportage

In-depth Coverage.

Creative

Selected stock imagery.

Dukas Bildagentur
request@dukas.ch
+41 44 298 50 00

Your search:

380 result(s) in 0.24 s

  • Durchschlag Gotthard
    DUKAS_90983567_GER
    Durchschlag Gotthard
    FOTO: PETER GERBER, 15.10.2010, Sedrun (GR):
    Durchschlag Gotthard. die beiden Geistlichen: v.l. Pater Dekan Vigeli Monn, Vize Abt. Kloster Disentis, und Pfarrer Peter Reto Nay, Pfarrer von Sedrun

    DUKAS/Peter Gerber

     

  • Wilhelm Fillafer
    RDB00368426
    Wilhelm Fillafer
    FOTO: PHILIPPE ROSSIER, 25.02.2009, AMSTEG UR, DING DONG BEIM TUNNELARBEITER WILHELM FILLAFER (42). BILD: WC- RDB BY DUKAS
    RDB

     

  • Wilhelm Fillafer
    RDB00368337
    Wilhelm Fillafer
    FOTO: PHILIPPE ROSSIER, 25.02.2009, AMSTEG UR, DING DONG BEIM TUNNELARBEITER WILHELM FILLAFER (42, 2.VL). BILD: IN DIE KÜCHE, RESP. KANTINE- RDB BY DUKAS
    RDB

     

  • Wilhelm Fillafer
    RDB00368181
    Wilhelm Fillafer
    FOTO: PHILIPPE ROSSIER, 25.02.2009, AMSTEG UR, DING DONG BEIM TUNNELARBEITER WILHELM FILLAFER (42, 2.VL). BILD: BAUBARACKEN- RDB BY DUKAS
    RDB

     

  • Wilhelm Fillafer
    RDB00338747
    Wilhelm Fillafer
    FOTO: PHILIPPE ROSSIER, 25.02.2009, AMSTEG UR, DING DONG BEIM TUNNELARBEITER WILHELM FILLAFER (42). BILD: GARDEROBE- RDB BY DUKAS
    RDB

     

  • rdb00281302
    RDB00281302
    rdb00281302
    --- Titelblatt Schweizer Illustrierte vom 3. Januar 1966: Bau Gotthard-Autobahntunnel#Cover of Schweizer Illustrierte of 3rd januar 1966: Gotthard tunnel construction- RDB BY DUKAS
    RDB

     

  • Baugewerbe  Baustelle
    DUKAS_90911086_GSS
    Baugewerbe Baustelle
    Baustelle Tunnelbau
    DUKAS/A.J. GEISSER

     

  • Baugewerbe  Baustelle
    DUKAS_90894408_GSS
    Baugewerbe Baustelle
    Baustelle Tunnelbau
    DUKAS/A.J. GEISSER

     

  • Sessiun Flims
    RDB00140275
    Sessiun Flims
    --- Fulvio Pelli und Ruedi Noser besichtigen die Porta Alpina Baustelle; 2006#Fulvio Pelli and Ruedi Noser visiting Porta Alpina construction site; 2006- RDB BY DUKAS
    RDB

     

  • Sessiun Flims
    RDB00005726
    Sessiun Flims
    --- Ursula Wyss besichtigt Baustelle der Porta Alpina; 2006#Ursula Wyss visiting Porta Alpina construction site; 2006
    RDB

     

  • BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    DUKAS_90993907_AMM
    BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    SCHWEIZ, SARGANS, MELS. 5. SEPTEMBER 2006 - BILD AUS DEM VERSUCHSTOLLEN HAGERBACH. HEINZ DISCH (R) SCHAUT SICH EINEN DUENNSCHLIFF AM MIKROSKOP AN. OLIVER OBERDANNER (L) LEGT STEINE FUER EINEN POLIERWIEDERSTAND TEST EIN.

    FOTO BY DANIEL AMMANN

    DUKAS/Daniel Ammann

     

  • BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    DUKAS_90992712_AMM
    BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    SCHWEIZ, SARGANS, MELS. 5. SEPTEMBER 2006 - BILD AUS DEM VERSUCHSTOLLEN HAGERBACH. DIE HEILIGE BARBARA WACHT IM STOLLEN UEBER DIE BERGLEUTE.

    FOTO BY DANIEL AMMANN

    DUKAS/Daniel Ammann

     

  • BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    DUKAS_90991247_AMM
    BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    SCHWEIZ, SARGANS, MELS. 5. SEPTEMBER 2006 - BILD AUS DEM VERSUCHSTOLLEN HAGERBACH. SVEN SEIRER M ISST DIE ATG TUEREN AUF DEM PRUEFSTAND.

    FOTO BY DANIEL AMMANN

    DUKAS/Daniel Ammann

     

  • BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    DUKAS_90991246_AMM
    BILD AUS DEM VERSUCHSTOLLEN HAGERBACH
    SCHWEIZ, SARGANS, MELS. 5. SEPTEMBER 2006 - BILD AUS DEM VERSUCHSTOLLEN HAGERBACH. SVEN SEIRER M ISST DIE ATG TUEREN AUF DEM PRUEFSTAND.

    FOTO BY DANIEL AMMANN

    DUKAS/Daniel Ammann

     

  • Gotthardtunnelbau 1980
    RDB00015298
    Gotthardtunnelbau 1980
    Kloster Seedorf und Urnersee#Seedorf convent and Lake Uri#
    RDB

     

  • Lötschbergtunnel 2005: Leuenberger mit Joel und Silvan, nach dem Durchstich
    RDB00163755
    Lötschbergtunnel 2005: Leuenberger mit Joel und Silvan, nach dem Durchstich
    --- Lötschbergtunnel 2005: Leuenberger mit Joel und Silvan, nach dem Durchstich#Lotschberg tunnel 2005: Leuenberger mit Joel und Silvan, after the final blast- RDB BY DUKAS
    RDB

     

  • Lötschberg-Durchschlagfeier 2005; Jean-René Fournier, Barbara Egger
    RDB00075497
    Lötschberg-Durchschlagfeier 2005; Jean-René Fournier, Barbara Egger
    Lötschberg, 28 x sLötschberg, 28. April, 2005: Denkwürdiger Augenblick: Durchschlag des Basistunnels. Sandr
    RDB

     

  • Lötschbergtunnel 2005; Nach dem Durchstich
    RDB00032507
    Lötschbergtunnel 2005; Nach dem Durchstich
    --- Lötschbergtunnel 2005; Nach dem Durchstich#Lotschberg tunnel 2005; after the final blast
    RDB

     

  • Lötschberg-Durchschlagfeier 2005; Adolf Ogi, Hermann Weyeneth
    RDB00027455
    Lötschberg-Durchschlagfeier 2005; Adolf Ogi, Hermann Weyeneth
    Lötschberg, 28 x sLötschberg, 28. April, 2005: Denkwürdiger Augenblick: Durchschlag des Basistunnels. Sandr
    RDB

     

  • NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
    RDB00217001
    NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
    --- NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004 #Pile of rubble and road bypassing closed Mitholz tunnel, 2004- RDB BY DUKAS
    RDB

     

  • NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
    RDB00216568
    NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004
    --- NEAT-Schuttkegel und Umfahrungsstrasse um gesperrten Mitholz-Tunnel, 2004 #Pile of rubble and road bypassing closed Mitholz tunnel, 2004- RDB BY DUKAS
    RDB

     

  • Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004
    RDB00166580
    Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004
    --- Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004 # Men standing on pile of rubble of NEAT building site at Kandersteg, 2004- RDB BY DUKAS
    RDB

     

  • Sicht vom Höhenweg Nordrampe auf die NEAT-Baustelle und Mitholz-Tunnel, 2004
    RDB00164028
    Sicht vom Höhenweg Nordrampe auf die NEAT-Baustelle und Mitholz-Tunnel, 2004
    --- Sicht vom Höhenweg Nordrampe auf die NEAT-Baustelle und Mitholz-Tunnel, 2004#View on building site of the NEAT and on Mitholz tunnel, 2004- RDB BY DUKAS
    RDB

     

  • Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004
    RDB00163773
    Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004
    --- Männer auf Schuttkegel der NEAT-Baustelle, Kandersteg 2004 #Men standing on pile of rubble of NEAT building site at Kandersteg, 2004- RDB BY DUKAS
    RDB

     

  • NEAT-Baustelle und Mitholz-Tunnel, 2004
    RDB00143687
    NEAT-Baustelle und Mitholz-Tunnel, 2004
    --- NEAT-Baustelle und Mitholz-Tunnel, 2004 #View on building site of the NEAT and on Mitholz tunnel, 2004- RDB BY DUKAS
    RDB

     

  • Gesperrter Mitholz-Tunnel, 2004
    RDB00006203
    Gesperrter Mitholz-Tunnel, 2004
    --- Gesperrter Mitholz-Tunnel, 2004 #Closed Mitholz tunnel, 2004
    RDB

     

  • dukas 90704413 heu
    DUKAS_90704413_HEU
    dukas 90704413 heu
    --- NEAT-Baustelle in Bodio: Bohrkopf der längsten Tunnel-Bohrmaschine der Welt#Neat construction near Bodio: drill head of the world's largest tunnel drilling machine
    DUKAS/Olivia Heussler

     

  • dukas 90704411 heu
    DUKAS_90704411_HEU
    dukas 90704411 heu
    --- NEAT-Baustelle in Bodio: Schottischer Monteur#Neat-construction near Bodio: scottish mechanic
    DUKAS/Olivia Heussler

     

  • NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre
    DUKAS_90704152_HEU
    NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre
    --- NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre#Neat-construction near Bodio: easttunnel, westtunnel
    DUKAS/Olivia Heussler

     

  • NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre
    DUKAS_90704149_HEU
    NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre
    --- NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre#Neat-construction near Bodio: easttunnel, westtunnel
    DUKAS/Olivia Heussler

     

  • NEAT Baustelle bei Bodio: Südportal, 2003
    DUKAS_90704102_HEU
    NEAT Baustelle bei Bodio: Südportal, 2003
    --- NEAT Baustelle bei Bodio: Südportal, 2003#Neat-construction near Bodio: southern portal, 2003
    Dukas/Olivia Heussler

     

  • NEAT Baustelle bei Bodio: Südportal, 2003
    DUKAS_90704101_HEU
    NEAT Baustelle bei Bodio: Südportal, 2003
    --- NEAT Baustelle bei Bodio: Südportal, 2003#Neat-construction near Bodio: southern portal, 2003
    Dukas/Olivia Heussler

     

  • NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre
    DUKAS_90703948_HEU
    NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre
    --- NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre#Neat-construction near Bodio: easttunnel, westtunnel
    Dukas/Olivia Heussler

     

  • Arbeiter im Basistunnel, Sedrun 2003
    DUKAS_90997725_AMM
    Arbeiter im Basistunnel, Sedrun 2003
    --- Arbeiter im Basistunnel, Sedrun 2003#Tunnel Construction with workers, Sedrun 2003
    DUKAS/Daniel Ammann

     

  • Arbeiter im Basistunnel, Sedrun 2003
    DUKAS_90997028_AMM
    Arbeiter im Basistunnel, Sedrun 2003
    --- Arbeiter im Basistunnel, Sedrun 2003#Tunnel Construction with workers, Sedrun 2003
    DUKAS/Daniel Ammann

     

  • Arbeiter im Basistunnel, Sedrun 2003
    DUKAS_90996144_AMM
    Arbeiter im Basistunnel, Sedrun 2003
    --- Arbeiter im Basistunnel, Sedrun 2003#Tunnel Construction with workers, Sedrun 2003
    DUKAS/Daniel Ammann

     

  • Container Siedlung für die Arbeiter unter Tage, Sedrun 2003
    DUKAS_90993767_AMM
    Container Siedlung für die Arbeiter unter Tage, Sedrun 2003
    --- Container Siedlung für die Arbeiter unter Tage, Sedrun 2003#Container settlement for the tunnel workers, Sedrun 2003
    DUKAS/Daniel Ammann

     

  • dukas 90704146 heu
    DUKAS_90704146_HEU
    dukas 90704146 heu
    --- Neat-Bauarbeiten bei Bodio: Fels zur Oströhre#Neat-construction near Bodio: rock to the easttunnel
    DUKAS/Olivia Heussler

     

  • dukas 90704103 heu
    DUKAS_90704103_HEU
    dukas 90704103 heu
    --- Gotthard-Basistunnel: Besucher-Garderobe 2003#Gotthard base tunnel: coat rack for visitors
    Dukas/Olivia Heussler

     

  • RIIESENFFEST FÜR DIE BAREGGRÖHRE
    RDB00167018
    RIIESENFFEST FÜR DIE BAREGGRÖHRE

    SARAH CONNOR WAR DER HÖHEPUNKT AM SAMSTAGABEND...

    BL 114.03.09- RDB BY DUKAS

    RDB

     

  • dukas 90704410 heu
    DUKAS_90704410_HEU
    dukas 90704410 heu
    --- NEAT-Baustelle in Bodio, 2002#Neat-construction near Bodio, 2002
    DUKAS/Olivia Heussler

     

  • Peter Zbinden
    DUKAS_90704518_HEU
    Peter Zbinden
    --- NEAT-Baustelle in Bodio 2002: Peter Zbinden #Neat-construction near Bodio 2002: Peter Zbinden
    DUKAS/Olivia Heussler

     

  • Arturo Henninger
    DUKAS_90704517_HEU
    Arturo Henninger
    --- NEAT-Baustelle in Bodio: Einweihung der längsten Tunnelbohrmaschine der Welt, Arturo Henninger, Marco Borradori, "Maschinen-Patin" Stelia Rossi und Peter Zbinden#Neat construction near Bodio: inauguration of the world's longest tunnel drilling machine, Arturo Henninger, Marco Borradori, Stelia Rossi and Peter Zbinden
    DUKAS/Olivia Heussler

     

  • dukas 90704521 heu
    DUKAS_90704521_HEU
    dukas 90704521 heu
    --- Belüftungschlauch, Neat Baustelle in Bodio, 2002#ventilation system, Neat building site, 2002
    DUKAS/Olivia Heussler

     

  • dukas 90704528 heu
    DUKAS_90704528_HEU
    dukas 90704528 heu
    Verbindung von der Oströhre zur Weströhre--- NEAT-Baustelle in Bodio: Verbindung der Oströhre zur Weströhre#Neat-construction near Bodio: easttunnel, westtunnel
    DUKAS/Olivia Heussler

     

  • NEAT-Baustelle bei Amsteg: Adolf Ogi
    DUKAS_90704412_HEU
    NEAT-Baustelle bei Amsteg: Adolf Ogi
    --- NEAT-Baustelle bei Amsteg: Adolf Ogi#Neat-construction near Amsteg: Adolf Ogi
    DUKAS/Olivia Heussler

     

  • STREIK I8N TUNNELHÖLLE
    RDB00157341
    STREIK I8N TUNNELHÖLLE
    Steg VS PK vom 17.04.02 Von links Kilian Jaun, Mariano Pacheco, Roman Burger und Jeanny Morard.

    BL 89.02/5- RDB BY DUKAS

    RDB

     

  • DRECKLUFT SORGT FÜR HEISSE KÖPFE
    RDB00180386
    DRECKLUFT SORGT FÜR HEISSE KÖPFE
    GBI-Mann Roman Burger links wird von Suva Experten Vetto Vaglia hart kritisiert.

    BL 82.02/5- RDB BY DUKAS

    RDB

     

  • IN DER TUNNELH…LLE GING DER KICKBOXER ZU BODEN
    RDB00209688
    IN DER TUNNELH…LLE GING DER KICKBOXER ZU BODEN
    Vier Kilometer von Goppenstein in den Neat-Basistunnel Ferden steht dieses Gerüst an dem Andreas Noti seine Montage-Arbeit verrichtete.Hier rang er wegen schlechter Luftzirkulation im Tunnel nach Atem und musste per Heli ins Spital geflogen werden.Oben auf dem Gerüst wird die Luftturbinen montiert.

    BL 77.02/5- RDB BY DUKAS

    RDB

     

  • Pier Luigi Folonaro
    RDB00244490
    Pier Luigi Folonaro
    Neat Baustelle, Faido#Neat building site, Faido--- Beim Bohren von Sprenglöchern in den Neat Sondierstollen, 1997#Drilling holes at the Neat building site, 1997- RDB BY DUKAS
    RDB

     

  • Next page