Your search:
250 result(s) in 0.04 s
-
DUKAS_188371849_NUR
Bunker School In Kharkiv Built To Protect Students From Russian Airstrikes
The corridor of an underground school in Kharkiv is prepared for educational activities and to be protected from any Russian air attack. (Photo by Francisco Richart Barbeira/NurPhoto) -
DUKAS_188371801_NUR
Bunker School In Kharkiv Built To Protect Students From Russian Airstrikes
The corridor of an underground school in Kharkiv is prepared for educational activities and to be protected from any Russian air attack. (Photo by Francisco Richart Barbeira/NurPhoto) -
DUKAS_187140100_NUR
Daily Life In Berlin
A corridor that leads to Potsdamer Platz station is pictured in Berlin, Germany, on July 15, 2025. (Photo by Alberto Pezzali/NurPhoto) -
DUKAS_187140098_NUR
Daily Life In Berlin
A corridor that leads to Potsdamer Platz station is pictured in Berlin, Germany, on July 15, 2025. (Photo by Alberto Pezzali/NurPhoto) -
DUKAS_186649980_NUR
Daily Life In Stockholm
Two pedestrians walk beneath a modern glass and steel structure with geometric reflections in Stockholm, Sweden, on May 6, 2024. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_186412179_NUR
Zelivskeho Subway Station Platform In Prague
Passengers wait on the platform of the Zelivskeho subway station in Prague, Czech Republic, on May 10, 2025. The station serves the local underground public transport system on Line A. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_186412175_NUR
Zelivskeho Subway Station Platform In Prague
Passengers wait on the platform of the Zelivskeho subway station in Prague, Czech Republic, on May 10, 2025. The station serves the local underground public transport system on Line A. (Photo by Michael Nguyen/NurPhoto) -
DUKAS_186169529_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169439_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169437_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A man jogs over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169436_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169433_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169432_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
Cycles are parked over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169431_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169429_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169428_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169427_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169425_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_186169419_NUR
Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_183800236_POL
Ukrainian children forced to learn underground as Russia targets civilians
A motivational phrase is written on the wall in the recently unveiled third underground school in Kharkiv, Ukraine, on April 21, 2025.(Photo by Viacheslav Madiievskyi/Ukrinform/POLARIS) (FOTO:DUKAS/POLARIS)
Ukrinform -
DUKAS_183800212_POL
Ukrainian children forced to learn underground as Russia targets civilians
Workers stay in the corridor during the opening of the third underground school in Kharkiv, Ukraine, on April 21, 2025. (Photo by Viacheslav Madiievskyi/Ukrinform/POLARIS) (FOTO:DUKAS/POLARIS)
Ukrinform -
DUKAS_183697279_POL
Ukraine’s 2nd Superhumans Center under construction in Dnipro
Builders work at the construction site of Ukraine’s second prosthetics and rehabilitation centre, Dnipro, Ukraine, on April 11, 2025. (Photo by Dmytro Smolienko/Ukrinform/POLARIS) (FOTO:DUKAS/POLARIS)
Ukrinform -
DUKAS_181472520_POL
Odesa recovers from Russian drone attack
ODESA, UKRAINE - FEBRUARY 20, 2025 - A woman is in the corridor of a building damaged by a Russian drone strike, Odesa, southern Ukraine. (Photo by Nina Liashonok/Ukrinform/POLARIS) (FOTO:DUKAS/POLARIS)
Ukrinform -
DUKAS_180344442_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344439_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344437_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344433_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344432_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344430_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344429_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344426_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344425_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344421_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344420_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344419_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344418_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344412_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344408_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344405_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344404_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344402_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344393_POL
Displaced Gazans cross Netzarim corridor into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Omar Ashtawy/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344369_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344367_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344365_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344363_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344362_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344361_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344360_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages -
DUKAS_180344359_POL
Displaced Gazans cross Netzarim into Gaza City
January 27, 2025 - Gaza: Displaced Gazans cross the Netzarim corridor from the southern Gaza Strip into Gaza City on January 27, 2025. Displaced Palestinians began returning to northern Gaza on January 27, an official at the territory's Hamas-run Interior Ministry told, after a breakthrough in negotiations between Hamas and Israel. (Naaman Omar/APAImages/Polaris) (FOTO:DUKAS/POLARIS)
apaimages