Your search:
53 result(s) in 0.15 s
-
DUKAS_189868592_NUR
Daily Life In Bucharest
BUCHAREST, ROMANIA – OCTOBER 10:
The entrance gate to the People’s Salvation Cathedral, also known as the National Cathedral, an Eastern Orthodox cathedral under construction facing the Palace of Parliament, is seen on Spirea’s Hill in Bucharest, Romania, on October 10, 2025.
The cathedral is scheduled for official opening on October 26, 2025, with a historic consecration ceremony led by Ecumenical Patriarch Bartholomew I and Patriarch Daniel of Romania. (Photo by Artur Widak/NurPhoto) -
DUKAS_189868561_NUR
Daily Life In Bucharest
BUCHAREST, ROMANIA – OCTOBER 10:
People queue for confession inside a temporary church near the entrance to the People’s Salvation Cathedral, a structure used for services while the main cathedral was under construction, in Bucharest, Romania, on October 10, 2025.
The new cathedral is scheduled for official opening on October 26, 2025, with a historic consecration ceremony led by Ecumenical Patriarch Bartholomew I and Patriarch Daniel of Romania. (Photo by Artur Widak/NurPhoto) -
DUKAS_188654466_NUR
Daily Life In Gdansk
GDANSK, POLAND – AUGUST 31:
A new ferry under construction inside the Gdansk Shipyard, in Gdansk, Pomeranian Voivodeship, Poland, on August 31, 2025.
The historic shipyard, known as the birthplace of the Solidarity movement, remains an important center for Poland’s maritime industry and shipbuilding tradition. (Photo by Artur Widak/NurPhoto) -
DUKAS_188569679_NUR
Nepal’s TU Cricket Ground Awaits Complete Make-over, Construction Work At Snail’s Pace
Prakash Man Singh, Minister for Urban Development, poses for a photo during the inspection of the under-construction TU Cricket ground in Kathmandu, Nepal, on September 7, 2025. The stadium has a capacity of 10,000 spectators, divided into two sections. The eastern stand accommodates 2,290 seats, while the western stand holds 7,710. It has floodlights surrounding its corners, enabling games to be played in low light during nighttime. Work proceeds at a rapid pace as the ground needs to be prepared for the second edition of the Nepal Premier League (NPL) scheduled for November. (Photo by Subaas Shrestha/NurPhoto) -
DUKAS_188438134_NUR
India Boys Lifestyle
Indian boys are seen at an under-construction pandal, a decoration for the upcoming Hindu festival Durga Puja, in Siliguri, India, on September 4, 2025. (Photo by Diptendu Dutta/NurPhoto) -
DUK10102401_008
NEWS - Japan rüstet sich für die olympischen Spiele 2020
Construction workers are seen at the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_006
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_009
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_013
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_010
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_012
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_011
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_016
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_015
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_014
NEWS - Japan rüstet sich für die olympischen Spiele 2020
Construction workers are seen at the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_018
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_017
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_021
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_019
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_023
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_020
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_022
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_002
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_025
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_026
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_004
NEWS - Japan rüstet sich für die olympischen Spiele 2020
Construction workers are seen at the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_005
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_024
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_001
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_003
NEWS - Japan rüstet sich für die olympischen Spiele 2020
Construction workers are seen at the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_007
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_027
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUK10102401_028
NEWS - Japan rüstet sich für die olympischen Spiele 2020
A view of the new National Stadium under construction on August 31, 2018, Tokyo, Japan. The new stadium will host the 2020 Tokyo Olympic and Paralympic Games. (Photo by Rodrigo Reyes Marin/AFLO)
(c) Dukas -
DUKAS_123908476_RHA
Sagrada Familia, by architect Antonio Gaudi, UNESCO World Heritage Site, Barcelona, Catalonia, Spain
Sagrada Familia, by architect Antonio Gaudi, UNESCO World Heritage Site, Barcelona, Catalonia, Spain, Europe
Markus Lange -
DUKAS_38092122_ACP
Neubau der Europäischen Zentralbank in Frankfurt
Der Neubau der Europäischen Zentralbank in Frankfurt
/ 010314
*** Frankfurt, Germany, the new Headquarter of European Central Bank in Frankfurt under construction, the financial district in the background, March, 01, 2014 ***
(FOTO: DUKAS/ACTIONPRESS)
DUKAS/ACTIONPRESS -
DUKAS_38092119_ACP
Neubau der Europäischen Zentralbank in Frankfurt
Der Neubau der Europäischen Zentralbank in Frankfurt
/ 010314
*** Frankfurt, Germany, the new Headquarter of European Central Bank in Frankfurt under construction, the financial district in the background, March, 01, 2014 ***
(FOTO: DUKAS/ACTIONPRESS)
DUKAS/ACTIONPRESS -
DUKAS_38092108_ACP
Neubau der Europäischen Zentralbank in Frankfurt
Der Neubau der Europäischen Zentralbank in Frankfurt
/ 010314
*** Frankfurt, Germany, the new Headquarter of European Central Bank in Frankfurt under construction, the financial district in the background, March, 01, 2014 ***
(FOTO: DUKAS/ACTIONPRESS)
DUKAS/ACTIONPRESS -
DUKAS_38092106_ACP
Neubau der Europäischen Zentralbank in Frankfurt
Der Neubau der Europäischen Zentralbank in Frankfurt
/ 010314
*** Frankfurt, Germany, the new Headquarter of European Central Bank in Frankfurt under construction, the financial district in the background, March, 01, 2014 ***
(FOTO: DUKAS/ACTIONPRESS)
DUKAS/ACTIONPRESS -
DUKAS_21561297_REV
dukas 21561297 rev
EXCLUSIVE Pierce Brosnan
Los Angeles
December 9 2011
Pierce Brosnan and his mother May Smith arrive in his Aston Martin Vanquish at their Malibu beach front house under construction
ID revpix111209201 (FOTO: DUKAS/REVOLUTIONPIX)
DUKAS/REVOLUTIONPIX -
DUKAS_21561291_REV
dukas 21561291 rev
EXCLUSIVE Pierce Brosnan
Los Angeles
December 9 2011
Pierce Brosnan and his mother May Smith arrive in his Aston Martin Vanquish at their Malibu beach front house under construction
ID revpix111209201 (FOTO: DUKAS/REVOLUTIONPIX)
DUKAS/REVOLUTIONPIX -
DUKAS_21561289_REV
dukas 21561289 rev
EXCLUSIVE Pierce Brosnan
Los Angeles
December 9 2011
Pierce Brosnan and his mother May Smith arrive in his Aston Martin Vanquish at their Malibu beach front house under construction
ID revpix111209201 (FOTO: DUKAS/REVOLUTIONPIX)
DUKAS/REVOLUTIONPIX -
DUKAS_21561283_REV
dukas 21561283 rev
EXCLUSIVE Pierce Brosnan
Los Angeles
December 9 2011
Pierce Brosnan and his mother May Smith arrive in his Aston Martin Vanquish at their Malibu beach front house under construction
ID revpix111209201 (FOTO: DUKAS/REVOLUTIONPIX)
DUKAS/REVOLUTIONPIX -
DUKAS_20080912_EYE
CHINA-AUGUST PMI-REBOUND (CN)
(110901) -- WEIHAI, Sept. 1, 2011 (Xinhua) -- Photo taken on Aug. 22, 2011 shows a vessel is under construction at a port of Shandong Huanghai Shipbuilding Co., Ltd. in Weihai City, east China's Shandong Province.
China's Purchasing Managers' Index (PMI) rebounded to 50.9 percent in August from a 29-month low of 50.7 percent for July, the China Federation of Logistics and Purchasing (CFLP) said on Sept. 1. The August figure ended four consecutive months of decline. (Xinhua/Guo Xulei) (lfj)
Xinhua News Agency / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) *** Local Caption *** 00728595
Xinhua News Agency / eyevine. All Rights Reserved. -
DUKAS_20080909_EYE
CHINA-AUGUST PMI-REBOUND (CN)
(110901) -- WEIHAI, Sept. 1, 2011 (Xinhua) -- Photo taken on Aug. 22, 2011 shows a vessel is under construction at a port of Shandong Huanghai Shipbuilding Co., Ltd. in Weihai City, east China's Shandong Province.
China's Purchasing Managers' Index (PMI) rebounded to 50.9 percent in August from a 29-month low of 50.7 percent for July, the China Federation of Logistics and Purchasing (CFLP) said on Sept. 1. The August figure ended four consecutive months of decline. (Xinhua/Guo Xulei) (lfj)
Xinhua News Agency / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) *** Local Caption *** 00728590
Xinhua News Agency / eyevine. All Rights Reserved. -
DUKAS_17027540_EYE
The Shard - Shard London Bridge - London Bridge Tower - 32 London Bridge
Adam Blakely, crane co-ordinator for the Shard, pictured admiring the view from the 72nd top floor of the skyscraper in London. When completed in 2012, it will be the tallest building in the European Union.
© Susannah Ireland / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
DUKAS/EYEVINE -
DUKAS_17027530_EYE
The Shard - Shard London Bridge - London Bridge Tower - 32 London Bridge
Construction workers pictured from the 72nd top floor of The Shard skyscraper in London. When completed in 2012, it will be the tallest building in the European Union.
© Susannah Ireland / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
DUKAS/EYEVINE -
DUKAS_17027527_EYE
The Shard - Shard London Bridge - London Bridge Tower - 32 London Bridge
Adam Blakely, crane co-ordinator for the Shard, pictured admiring the view from the 72nd top floor of the skyscraper in London. When completed in 2012, it will be the tallest building in the European Union.
© Susannah Ireland / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
DUKAS/EYEVINE -
DUKAS_17027525_EYE
The Shard - Shard London Bridge - London Bridge Tower - 32 London Bridge
General view from the 72nd top floor of The Shard skyscraper in London. When completed in 2012, it will be the tallest building in the European Union.
© Susannah Ireland / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
DUKAS/EYEVINE -
DUKAS_17027524_EYE
The Shard - Shard London Bridge - London Bridge Tower - 32 London Bridge
Andy Bowden, crane operator for the Shard, pictured admiring the view from the 72nd top floor of the skyscraper in London. When completed in 2012, it will be the tallest building in the European Union.
© Susannah Ireland / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
DUKAS/EYEVINE -
DUKAS_17027521_EYE
The Shard - Shard London Bridge - London Bridge Tower - 32 London Bridge
Construction workers pictured from the 72nd top floor of The Shard skyscraper in London. When completed in 2012, it will be the tallest building in the European Union.
© Susannah Ireland / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
DUKAS/EYEVINE
