People

Die angesagtesten Promis bei uns. Die neuesten EXKLUSIVEN Bilder nur für registrierte User!

News

Aktuelles Tagesgeschehen rund um den Globus.

Features

Skurriles, Spassiges und Absurdes aus aller Welt.

Styling

Trends aus Fashion und Design.

Portrait

Premium Portraitfotografie.

Reportage

Stories, Facts und Hintergrund, alles im Bild.

Creative

Auf der Suche nach mehr? Prisma by Dukas.

Dukas Bildagentur
request@dukas.ch
+41 44 298 50 00

Ihre Suche nach:

269 Ergebnis(se) in 0.12 s

  • Daily Life In Nepal
    DUKAS_186623019_NUR
    Daily Life In Nepal
    A bird takes flight against the hilltops being lashed with rain surrounding Kathmandu Valley with the onset of monsoon as seen from a hill station in Kathmandu, Nepal, on July 3, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • Daily Life In Nepal
    DUKAS_186623018_NUR
    Daily Life In Nepal
    Birds take flight against the hilltops being lashed with rain surrounding Kathmandu Valley with the onset of monsoon as seen from a hill station in Kathmandu, Nepal, on July 3, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • Daily Life In Nepal
    DUKAS_186623015_NUR
    Daily Life In Nepal
    Rain lashes the hilltops surrounding Kathmandu Valley in Kathmandu, Nepal, on July 3, 2025, with the onset of the monsoon as seen from a hill station. (Photo by Subaas Shrestha/NurPhoto)

     

  • Monsoon Takes Hold In Nepal
    DUKAS_186279409_NUR
    Monsoon Takes Hold In Nepal
    Monsoon clouds shroud the skyline of Kathmandu Valley as the rainfall causes climatic effects in the Himalayan nation, as seen from a hill station on the outskirts of Kathmandu, Nepal, on June 22, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • Monsoon Takes Hold In Nepal
    DUKAS_186279407_NUR
    Monsoon Takes Hold In Nepal
    A rainbow stretches over the Kathmandu Valley following rainfall in Kathmandu, Nepal, on June 22, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • Monsoon Takes Hold In Nepal
    DUKAS_186279405_NUR
    Monsoon Takes Hold In Nepal
    A rainbow stretches over the Kathmandu Valley following rainfall in Kathmandu, Nepal, on June 22, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • Monsoon Takes Hold In Nepal
    DUKAS_186279404_NUR
    Monsoon Takes Hold In Nepal
    Monsoon clouds shroud the skyline of Kathmandu Valley as the rainfall causes climatic effects in the Himalayan nation, as seen from a hill station on the outskirts of Kathmandu, Nepal, on June 22, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • Monsoon Takes Hold In Nepal
    DUKAS_186279402_NUR
    Monsoon Takes Hold In Nepal
    A rainbow stretches over the Kathmandu Valley following rainfall in Kathmandu, Nepal, on June 22, 2025. (Photo by Subaas Shrestha/NurPhoto)

     

  • First Overpass Of Nepal Inaugurated
    DUKAS_186211819_NUR
    First Overpass Of Nepal Inaugurated
    Nepal Prime Minister KP Sharma Oli (Center) unveils the plaque during the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • First Overpass Of Nepal Inaugurated
    DUKAS_186211817_NUR
    First Overpass Of Nepal Inaugurated
    Nepal Prime Minister KP Sharma Oli addresses the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • First Overpass Of Nepal Inaugurated
    DUKAS_186211815_NUR
    First Overpass Of Nepal Inaugurated
    Nepal Prime Minister KP Sharma Oli (center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From the Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • First Overpass Of Nepal Inaugurated
    DUKAS_186211812_NUR
    First Overpass Of Nepal Inaugurated
    Nepal Prime Minister KP Sharma Oli (center holding the bouquet) arrives to attend the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • First Overpass Of Nepal Inaugurated
    DUKAS_186211810_NUR
    First Overpass Of Nepal Inaugurated
    Nepal Prime Minister KP Sharma Oli (second right from center) attends the inauguration ceremony of Nepal's first overpass in Lalitpur, Nepal, on June 20, 2025. The overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Drone View Of Gwarko Overpass  Highway In Lalitpur, Nepal.
    DUKAS_186198646_NUR
    Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
    The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto)

     

  • Drone View Of Gwarko Overpass  Highway In Lalitpur, Nepal.
    DUKAS_186198645_NUR
    Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
    The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto)

     

  • Drone View Of Gwarko Overpass  Highway In Lalitpur, Nepal.
    DUKAS_186198644_NUR
    Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
    The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto)

     

  • Drone View Of Gwarko Overpass  Highway In Lalitpur, Nepal.
    DUKAS_186198642_NUR
    Drone View Of Gwarko Overpass Highway In Lalitpur, Nepal.
    The aerial view shows the Gwarko Overpass highway in Lalitpur, Nepal, on June 20, 2025. The Gwarko Overpass is a newly built four-lane elevated highway in Lalitpur, designed to ease traffic congestion at one of Kathmandu's busiest junctions. (Photo by Ambir Tolang/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169532_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    Vehicles move under the newly built and Nepal's only underpass in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169529_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169439_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169438_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169437_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A man jogs over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169436_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A girl cycles over the newly built overpass infrastructure in Gwarko of Lalitpur, Nepal, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169435_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A Nepali woman poses for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169434_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A boy cycles over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169433_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169432_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    Cycles are parked over the newly built overpass infrastructure in Gwarko of Lalitpur on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169431_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169430_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169429_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169428_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169427_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169425_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People pose for a photo standing over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169423_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A boy skates over the newly built overpass infrastructure in Gwarko, Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169419_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    A general overview of the newly built flyover in Gwarko of Lalitpur along the ring road of Kathmandu Valley on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    DUKAS_186169418_NUR
    Nepal's First Overpass Road Infrastructure In Gwarko Ready For Operation
    People walk and cycle over the newly built overpass infrastructure in Gwarko of Lalitpur, on June 19, 2025. The long-awaited overpass is built to ease chronic traffic congestion along the Koteshwar-Gwarko-Kalanki corridor of the Kathmandu Valley. Initiated in February 2022 under the engineering, procurement, and construction (EPC) model, the four-lane overpass is originally slated for completion in two years. From Gwarko intersection, the structure spans 320 meters towards Koteshwar and 185 meters towards Satdobato, with both sides featuring four layers of blacktopping. The ramp stands 10.2 meters high. The project is awarded at a contract value of Rs176.68 million. Once operational, the contractor is responsible for the maintenance for the next five years. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956554_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956532_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956517_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956508_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956507_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956499_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956490_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Nepal After Incessant Rainfall
    DUKAS_185956420_NUR
    Waterlogging In Nepal After Incessant Rainfall
    Vehicles and commuters wade through a flooded section of the road along the Ring-road, the major highway surrounding Kathmandu Valley, in Kathmandu, Nepal, on June 13, 2025, after incessant rainfall. (Photo by Subaas Shrestha/NurPhoto)

     

  • Drone View Of Bhoto Jatra Celebration In Lalitpur, Nepal.
    DUKAS_185528049_NUR
    Drone View Of Bhoto Jatra Celebration In Lalitpur, Nepal.
    The aerial view shows Hindu devotees welcome the god Rato Machindranath with a barley straw fire during the Bhoto Jatra festival in Bungmati, Lalitpur, Nepal, on June 1, 2025 (Photo by Ambir Tolang/NurPhoto).

     

  • Drone View Of Bhoto Jatra Celebration In Lalitpur, Nepal.
    DUKAS_185528048_NUR
    Drone View Of Bhoto Jatra Celebration In Lalitpur, Nepal.
    The aerial view shows Hindu devotees welcome the god Rato Machindranath with a barley straw fire during the Bhoto Jatra festival in Bungmati, Lalitpur, Nepal, on June 1, 2025 (Photo by Ambir Tolang/NurPhoto).

     

  • Bhoto Jatra Celebration In Lalitpur, Nepal.
    DUKAS_185516550_NUR
    Bhoto Jatra Celebration In Lalitpur, Nepal.
    The black jewel-studded Bhoto is displayed from the chariot to the public to claim the owner of the Bhoto during the Bhoto Jatra festival in Lalitpur, Nepal, on June 1, 2025 (Photo by Ambir Tolang/NurPhoto).

     

  • Bhoto Jatra Celebration In Lalitpur, Nepal.
    DUKAS_185516547_NUR
    Bhoto Jatra Celebration In Lalitpur, Nepal.
    Gurju Paltan soldiers perform a parade in front of the Machindra chariot during the Bhoto Jatra festival in Lalitpur, Nepal, on June 01, 2025 (Photo by Ambir Tolang/NurPhoto).

     

  • Bhoto Jatra Celebration In Lalitpur, Nepal.
    DUKAS_185516544_NUR
    Bhoto Jatra Celebration In Lalitpur, Nepal.
    Nepalese soldiers perform a parade in front of the Machindra chariot during the Bhoto Jatra festival in Lalitpur, Nepal, on June 1, 2025 (Photo by Ambir Tolang/NurPhoto).

     

  • Bhoto Jatra Celebration In Lalitpur, Nepal.
    DUKAS_185516541_NUR
    Bhoto Jatra Celebration In Lalitpur, Nepal.
    The black jewel-studded Bhoto is displayed from the chariot to the public to claim the owner of the Bhoto during the Bhoto Jatra festival in Lalitpur, Nepal, on June 1, 2025 (Photo by Ambir Tolang/NurPhoto).

     

  • Nächste Seite