Ihre Suche nach:
153 Ergebnis(se) in 0.43 s
-
DUKAS_181983944_EYE
Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.
Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) -
DUKAS_181983953_EYE
Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.
Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) -
DUKAS_181983938_EYE
Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.
Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) -
DUKAS_181983947_EYE
Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.
Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) -
DUKAS_181983941_EYE
Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.
Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE) -
DUKAS_181983950_EYE
Heart and sole: the Salvadorian shoemaker Jose Rodriguez catering to Melbourne’s well-heeled
Jose Rodriguez gets 'a special kind of feeling' from his craft, derived from the fact 'that someone else is happy' with their new shoes.
Shoemaker Jose Rodriguez in his workshop at Trades Hall, Melbourne, Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
The Guardian -
DUKAS_177213740_EYE
Kupiansk trembles as Russian forces close in again
Russia's apparent plan is to flatten then reoccupy the Ukrainian city, where the situation has become dramatically worse since the beginning of October.
Russian combat units are now less than two miles from Kupiansk, Ukraine.
In recent weeks, however, the Russians have been advancing. Across the frontline, Ukrainian defences are crumbling at the fastest rate since 2022.
Oleksandr Ivantsov reassembles a drone in the warehouse where it is kept together with other tools
Alessio Mamo / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE)
Alessio Mamo -
DUKAS_169068250_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068252_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068249_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068257_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068256_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068258_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068248_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUKAS_169068251_EYE
'Always respond to what the instrument is doing': the Melbourne shop showcasing the rare craft of restoring violins
Martin Paul reveals how he brings new life to old instruments, and his own journey from musician to luthier.
Paul is a luthier - a maker and repairer of stringed instruments - and the owner of Martin Paul Fine Instruments in West Melbourne. The store specialises in repairing and restoring violins, violas, cellos and their bows, and also sells instruments.
Martin Paul repairs and restores violins in his Melbourne workshop. Australia.
Ellen Smith / Guardian / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com (FOTO: DUKAS/EYEVINE) -
DUK10149983_010
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209b)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_009
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209p)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_008
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209d)
NASA's Orion spacecraft sits on top of the SLS rocket as it rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_007
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209h)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_006
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209c)
NASA's Orion spacecraft sits on top of the SLS rocket as it rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_005
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209i)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_004
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209r)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_003
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209q)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_002
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209k)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10149983_001
NEWS - Die NASA bringt die SLS-Rakete zu ihrem Startkomplex im Kennedy Space Center
Mandatory Credit: Photo by Joe Marino/UPI/Shutterstock (12974209m)
NASA's SLS rocket rolls out of the Vehicle Assembly Building at the Kennedy Space Center, Florida on Monday, June 6, 2022. NASA completed repairs to the vehicle in preparation for another fueling test at Complex 39B.
NASA Moves SLS Rocket to its Launch Complex at the Kennedy Space Center, Florida - 06 Jun 2022
(c) Dukas -
DUK10146772_002
FEATURE - Die schönste und grösste "goldene Halskette" der Welt
Mandatory Credit: Photo by Sipa Asia/Shutterstock (12632648e)
On December 2, 2021, Nanjing City, Jiangsu Province, the Zhongshan Scenic Area of ‚Ä‚ÄNanjing in the early winter season is full of forests, colorful and picturesque. From the air, the yellowed sycamore leaves on the cemetery road are like a string of Meiling Palace. "Golden Necklace" is so beautiful, ushering in the most beautiful viewing moment of the year.
Viewed from the air through a drone, rows of platanus trees form a collar. The Meiling Palace in Xuanwu District of Nanjing is like a gem inlaid at the end of the necklace, quietly nestling at the foot of the Purple Mountain. There are folk rumors that the Meiling Palace was a "birthday gift" from Chiang Kai-shek to Soong Meiling. Netizens called this "the world's best necklace" as Jiang Gong's romantic confession to his beloved wife. It is understood that the trees forming the "necklace" on the cemetery road were not planted in the same period.
According to records, the earliest construction budget of Meiling Palace was 260,000 silver dollars, but in the end it actually spent 320,000 silver dollars. The money was first advanced by the Army, Navy and Air Force Command, and later the Nanjing Municipal Finance Bureau also contributed part of the advance. The financial pit left by Meiling Palace for the two departments was finally filled by Chiang Kai-shek with the reimbursement of the total reserve fund of the state finance.
Due to disrepair, Meiling Palace started repairs in December 2012 and was completed in September 2013. The rows of fatons are layered on top of each other, and the shape is like a necklace, which is very spectacular. Netizens called it "the most awesome necklace in the world." These necklace-shaped platanus trees were not planted at the same time. The Fatong that forms the "collar" on the cemetery avenue was planted during the construction of the Zhongshan Cemetery from 1925 to 1929, and the Fatong that formed a "pendant" ..
(c) Dukas -
DUK10146772_001
FEATURE - Die schönste und grösste "goldene Halskette" der Welt
Mandatory Credit: Photo by Sipa Asia/Shutterstock (12632648d)
On December 2, 2021, Nanjing City, Jiangsu Province, the Zhongshan Scenic Area of ‚Ä‚ÄNanjing in the early winter season is full of forests, colorful and picturesque. From the air, the yellowed sycamore leaves on the cemetery road are like a string of Meiling Palace. "Golden Necklace" is so beautiful, ushering in the most beautiful viewing moment of the year.
Viewed from the air through a drone, rows of platanus trees form a collar. The Meiling Palace in Xuanwu District of Nanjing is like a gem inlaid at the end of the necklace, quietly nestling at the foot of the Purple Mountain. There are folk rumors that the Meiling Palace was a "birthday gift" from Chiang Kai-shek to Soong Meiling. Netizens called this "the world's best necklace" as Jiang Gong's romantic confession to his beloved wife. It is understood that the trees forming the "necklace" on the cemetery road were not planted in the same period.
According to records, the earliest construction budget of Meiling Palace was 260,000 silver dollars, but in the end it actually spent 320,000 silver dollars. The money was first advanced by the Army, Navy and Air Force Command, and later the Nanjing Municipal Finance Bureau also contributed part of the advance. The financial pit left by Meiling Palace for the two departments was finally filled by Chiang Kai-shek with the reimbursement of the total reserve fund of the state finance.
Due to disrepair, Meiling Palace started repairs in December 2012 and was completed in September 2013. The rows of fatons are layered on top of each other, and the shape is like a necklace, which is very spectacular. Netizens called it "the most awesome necklace in the world." These necklace-shaped platanus trees were not planted at the same time. The Fatong that forms the "collar" on the cemetery avenue was planted during the construction of the Zhongshan Cemetery from 1925 to 1929, and the Fatong that formed a "pendant" ..
(c) Dukas -
DUKAS_118713299_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Walkers go around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713300_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Cyclists and walkers go around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713297_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A runner goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713275_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A cyclist goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713273_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A cyclist goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713295_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Pedestrians walk around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713276_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A cyclist stops at Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713315_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A cyclist stops at Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713296_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Hammersmith Bridge which crosses the River Thames in West London lays empty after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713272_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Hammersmith Bridge which crosses the River Thames in West London lays empty after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713294_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Hammersmith Bridge which crosses the River Thames in West London lays empty after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713274_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Rowers keep away from Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713303_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A Walk goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713302_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. A Walk goes around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUKAS_118713301_EYE
Hammersmith Bridge closes to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge appeared to worsen by the heatwave
14/08/2020. London, UK. Walkers go around Hammersmith Bridge which crosses the River Thames in West London after Fulham Council suddenly closed it to all traffic Thursday night due to safety concerns. Hammersmith Bridge has been close to all traffic including pedestrians, cyclists and boats going under it after cracks in the bridge have become larger by the heatwave.
© Alex Lentati / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http:///www.eyevine.com (FOTO: DUKAS/EYEVINE)
© Alex Lentati / eyevine -
DUK10132738_040
NEWS - USA Unruhen: Geplünderte und verbarrikadierte Läden in New York
Customers wait outside of Echelon Cycles in New York on Saturday, May 20, 2020.
(c) Dukas -
DUKAS_102245942_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved. -
DUKAS_102245939_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved. -
DUKAS_102245936_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved. -
DUKAS_102245940_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved. -
DUKAS_102245941_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved. -
DUKAS_102245944_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
Pictures: Specialist surveyor team go down a 75 meter service tunnel to inspect the damage to the bridge foundations.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved. -
DUKAS_102245938_EYE
Hammersmith Bridge in London has been closed to motorists indefinitely after safety checks revealed critical faults.
A bridge over the Thames has been closed to traffic after the structure was found to have critical faults. Hammersmith Bridge, which opened in 1887, closed on Wednesday over safety concerns. Cyclists and pedestrians can still use the Grade II*-listed bridge but it will be closed to motorists indefinitely, Hammersmith and Fulham council said. The council blamed government cuts for the closure.
© Evening Standard / eyevine
Contact eyevine for more information about using this image:
T: +44 (0) 20 8709 8709
E: info@eyevine.com
http://www.eyevine.com
(FOTO: DUKAS/EYEVINE)
© Evening Standard / eyevine. All Rights Reserved.
