People

Die angesagtesten Promis bei uns. Die neuesten EXKLUSIVEN Bilder nur für registrierte User!

News

Aktuelles Tagesgeschehen rund um den Globus.

Features

Skurriles, Spassiges und Absurdes aus aller Welt.

Styling

Trends aus Fashion und Design.

Portrait

Premium Portraitfotografie.

Reportage

Stories, Facts und Hintergrund, alles im Bild.

Creative

Auf der Suche nach mehr? Prisma by Dukas.

Dukas Bildagentur
request@dukas.ch
+41 44 298 50 00

Ihre Suche nach:

85 Ergebnis(se) in 0.06 s

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_002
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Albert Jacobs, 43, from Virginia stands at the guard post at the entrance to Rosebud camp next to the Oceti Sakowin protest camp as the temperature drops. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683036
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_015
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A woman sits in her car in Rosebud camp near the Oceti Sakowin protest camp as the temperature drops. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683038
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_014
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: The Rosebud camp next to the Oceti Sakowin protest camp as the temperature drops. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683035
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_013
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Rob Hsueh, in yellow, leads a group shoveling a pathway at Rosebud Camp next to the Oceti Sakowin protest camp. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683033
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_011
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: The Rosebud camp next to the Oceti Sakowin protest camp as the temperature drops. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683034
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_012
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: The Rosebud camp next to the Oceti Sakowin protest camp as the temperature drops. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683032
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_001
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: The Rosebud camp next to the Oceti Sakowin protest camp as the temperature drops. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683031
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_010
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Fran Tatu, 59, chef, volunteers at the kitchen at Rosebud Camp next to the Oceti Sakowin protest camp. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683030
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_003
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683028
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_017
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Rosebud camp, which lies next to the Oceti Sakowin camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683027
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_018
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A man uses a sled to transport supplies to the Rosebud camp, which lies next to the Oceti Sakowin camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683025
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_016
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Chopping wood at Rosebud camp, which lies next to the Oceti Sakowin camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683026
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_021
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A dog roams camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683021
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_019
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A volunteer walks her friends dog through the snow. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683023
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_008
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683024
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_009
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Sun sets on the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683029
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_005
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A veteran who served two tours in Iraq and Afghanistan (did not wish to be named), volunteers as security and with evacuation. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683019
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_022
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A veteran who served two tours in Iraq and Afghanistan (did not wish to be named), volunteers as security and with evacuation. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683020
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_023
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A man chops wood for the sacred fire, a fire that burns at the center of camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683018
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_027
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Rob Hsueh, a volunteer from NYC who runs the maintenance and tools at the Rosebud camp next to the Oceti Sakowin camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683015
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_020
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A volunteer poses with his hand tattoos which form a peace sign. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683022
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_024
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A man eats a hot bowl of squash soup in a mess hall tent. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683017
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_007
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Frozen laundry and bottles of water near a mess hall tent. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683016
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_026
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A man helps dig a hole for the foundation of a winterized tool shed. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683014
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_025
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A group of people stand in embrace at camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683013
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_032
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Horses at camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683010
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_030
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A sign showing various destinations of visitors at camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683007
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_033
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A visitor to the camp poses for a photo near a sign showing various destinations of visitors at camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683008
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_004
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683002
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_029
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Damaged tents litter the campsite. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683004
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_055
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Damaged tents litter the campsite. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683009
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_035
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A frozen pelt near tents at camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683011
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_028
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Andy Nagel, a US Army veteran volunteers at the camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683005
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_072
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: Damaged tents litter the campsite. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683006
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_034
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 7, 2016 - Cannonball, North Dakota, United States: A dog wanders the frozen camp. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683012
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_031
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 6, 2016 - Cannonball, North Dakota, United States: Horses at a nearby ranch. Many have left the Oceti Sakowin protest camp as winter sets in, bringing subzero temperatures. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683003
    (c) Dukas

     

  • NEWS - North Dakota: Protestcamp gegen die Pipeline
    DUK10040421_006
    NEWS - North Dakota: Protestcamp gegen die Pipeline
    December 4, 2016 - Cannonball, North Dakota, United States: People cross route 1806 near the Oceti Sakowin protest camp. Thousands have gathered at the Oceti Sakowin camp to protest the Dakota Access Pipeline since April. Although many have left the camp after the US Army Corps denied the permit to complete the 1,172 mile multi billion dollar pipeline, some are determined to stay the winter. (Stephen Yang/Polaris) (FOTO:DUKAS/POLARIS) *** Local Caption *** 05683037
    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_030
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    Outside the site, the police tried again to fix the protesters, which they manage with about 100 people. More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Außerhalb des Kraftwerks versucht die Polizei erneut die Demonstranten festzusetzen, was ihnen mit etwa 100 Personen gelingt. Einige Aktivisten entfernten Schotter aus dem Gleisbett, die Aktion war unter den Blockadeteilnehmern umstritten. Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207529

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_029
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207527

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_028
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207524

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_027
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207519

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_026
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207521

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_025
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207518

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_024
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207520

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_023
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207514

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_022
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207515

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_021
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207512

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_020
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207503

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_019
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207504

    (c) Dukas

     

  • NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    DUK10024963_018
    NEWS - Deutsches Braunkohlekraftwerk nach Blockade wieder im Normalbetrieb
    Aktivisten stürmen das Vattenfall Kohle-Kraftwerk im Rahmen der Proteste gegen Kohle-Energie in Welzow / 140516

    [Welzow, Brandenburg, Germany - 14.05.2016

    More than 1000 climate protection activist block the coal delivery tracks of the Vattenfall Coal power plant "Schwarze Pumpe" near Welzow on the 2nd protest day of the anti-coal ”Ende Gelaende”-Camp. From rail blockades starting, stormed hundreds of protesters during the day the power plant site. About 100 people were arrested.

    Mehr als 1000 Klimaschutz-Demonstranten blockierten, am zweiten Protesttag des Anti-Kohleprotest-Camps ”Ende Gelaende” die Schienen zum Vattenfall Kohlekraftwerk ”Schwarze Pumpe. Aus den Blockaden heraus stuermten viele hundert Demonstranten das Kraftwerksgelaende, die Polizei nahm etwa 100 Demonstranten fest.

    ] (FOTO: DUKAS/ACTIONPRESS) *** Local Caption *** 22207505

    (c) Dukas

     

  • Nächste Seite