People

Die angesagtesten Promis bei uns. Die neuesten EXKLUSIVEN Bilder nur für registrierte User!

News

Aktuelles Tagesgeschehen rund um den Globus.

Features

Skurriles, Spassiges und Absurdes aus aller Welt.

Styling

Trends aus Fashion und Design.

Portrait

Premium Portraitfotografie.

Reportage

Stories, Facts und Hintergrund, alles im Bild.

Creative

Auf der Suche nach mehr? Prisma by Dukas.

Dukas Bildagentur
request@dukas.ch
+41 44 298 50 00

Ihre Suche nach:

131 Ergebnis(se) in 0.08 s

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789901_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers walk across the cliffs as they navigate the flooded section of the BP Highway in Kavrepalanchowk district, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks of the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week after heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplaces and temporary residences. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789899_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789898_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    A Nepali woman guides a child as they make their way through the flooded section of the flood and landslide-ravaged BP Highway in Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain battered the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who left Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789897_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Travelers cross over a section of BP Highway, which now turns into a flowing river following last weekend's heavy downpour, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789896_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    A vehicle wades through the flooded section of the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by floods in 2024. Within weeks since the disaster, the highway is brought back to operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789895_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    A Nepali woman carries her child on her back as she makes her way through the flooded section of the flood and landslide-ravaged BP Highway in Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789892_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers walk across the cliffs as they navigate the flooded section of the BP Highway in Kavrepalanchowk district, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks of the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week after heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplaces and temporary residences. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789891_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    People wade through the flooded section of the BP Highway following last weekend's heavy downpour, in Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789890_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789889_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Travelers cross over a section of BP Highway, which now turns into a flowing river following last weekend's heavy downpour, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789888_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    People wade through the flooded section of the BP Highway following last weekend's heavy downpour, in Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789887_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers walk across the cliffs as they navigate the flooded section of the BP Highway in Kavrepalanchowk district, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks of the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week after heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplaces and temporary residences. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789886_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    People wade through the flooded section of the BP Highway following last weekend's heavy downpour, in Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789884_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers walk across the cliffs as they navigate the flooded section of the BP Highway in Kavrepalanchowk district, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks of the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week after heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplaces and temporary residences. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789883_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Heavy load construction vehicles make a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, as per the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789882_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    A general view of the flooded plains in Chaukidanda along the BP Highway in Nepal, on October 9, 2025, shows the area ravaged by flood and landslide again following heavy downpour. Various sections of the BP Highway, built with Japanese assistance, are swept by floods of 2024. Within weeks since the disaster, diversions are set up to bring the highway back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling onto the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan Nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789880_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789879_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers walk across the cliffs as they navigate the flooded section of the BP Highway in Kavrepalanchowk district, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks of the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week after heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplaces and temporary residences. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789878_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Heavy load construction vehicles make a diversion in the Roshi River along the BP Highway in Kavrepalanchowk district of Nepal on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024, and within weeks since the disaster, diversions are set up to bring it back into operation. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, as per the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789877_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789876_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789875_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789874_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789873_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789872_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers walk across the cliffs as they navigate the flooded section of the BP Highway in Kavrepalanchowk district, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks of the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week after heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplaces and temporary residences. (Photo by Subaas Shrestha/NurPhoto)

     

  • Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    DUKAS_189789871_NUR
    Perilous Condition Of Nepal Highway Continues One Week After Heavy Downpour In 2025
    Nepali travelers wade through a flooded section of the BP Highway in Kavrepalanchowk District, Nepal, on October 9, 2025. Various sections of the BP Highway, built with Japanese assistance, are swept by the floods of 2024. Within weeks since the disaster, the highway is brought back into operation by setting up diversions. The local authorities, in coordination with the central government, are again setting up diversions, but people are forced to cling to the rocks to get across the road section and catch a bus to continue their journey. One week since the heavy rain batters the Himalayan nation, at least nine major highways connecting various parts of the country remain completely obstructed, according to the latest update from Nepal Police. As a result, many who leave Kathmandu Valley for their village homes for the Dashain festival face difficulties in returning to their workplace and temporary residence. (Photo by Subaas Shrestha/NurPhoto)

     

  • Waterlogging In Dhaka Streets After Heavy Rainfall
    DUKAS_189158965_NUR
    Waterlogging In Dhaka Streets After Heavy Rainfall
    Commuters, including office-goers and students, face severe difficulties as heavy rainfall causes waterlogging on Dhaka's major roads. (Photo by Sony Ramany/NurPhoto)

     

  • Waterlogging In Dhaka Streets After Heavy Rainfall
    DUKAS_189158963_NUR
    Waterlogging In Dhaka Streets After Heavy Rainfall
    Commuters, including office-goers and students, face severe difficulties as heavy rainfall causes waterlogging on Dhaka's major roads. (Photo by Sony Ramany/NurPhoto)

     

  • Waterlogging In Dhaka Streets After Heavy Rainfall
    DUKAS_189158962_NUR
    Waterlogging In Dhaka Streets After Heavy Rainfall
    Commuters, including office-goers and students, face severe difficulties as heavy rainfall causes waterlogging on Dhaka's major roads. (Photo by Sony Ramany/NurPhoto)

     

  • Waterlogging In Dhaka Streets After Heavy Rainfall
    DUKAS_189158961_NUR
    Waterlogging In Dhaka Streets After Heavy Rainfall
    Commuters, including office-goers and students, face severe difficulties as heavy rainfall causes waterlogging on Dhaka's major roads. (Photo by Sony Ramany/NurPhoto)

     

  • Waterlogging In Dhaka Streets After Heavy Rainfall
    DUKAS_189158960_NUR
    Waterlogging In Dhaka Streets After Heavy Rainfall
    Commuters, including office-goers and students, face severe difficulties as heavy rainfall causes waterlogging on Dhaka's major roads. (Photo by Sony Ramany/NurPhoto)

     

  • Travel Argentina
    DUKAS_184590274_POL
    Travel Argentina
    March 25, 2024 - Buenos Aires, Argentina: A special corner of the Attis restaurant, featuring a statue of the Virgin Mary. This building was constructed in 1890 to house the Santa María de la Salud convent. After the epidemic of yellow fever, the neighborhood of San Telmo was transformed and the convent became a residence of migrants. Tough Statement from the Catholic Church: "Food Cannot Be a Variable of Adjustment". In its first public statement since Milei's inauguration, the Executive Commission of the Argentine Episcopal Conference warned about the seriousness of the social situation, stating that "the daily bread is a cry for separation and justice" as the food crisis worsens. In an indirect response to the Minister of Human Capital, the bishops urged the continuation of assistance and support for community spaces and groups, while audits are carried out. Through a statement signed by Bishop Oscar Ojea, Argentina’s bishops acknowledged: "In our pastoral care for the simple people, who represent the majority of the population, no one should be denied food." They stressed that "in our homeland, no one should go hungry, as it is a land blessed with bread," but warned that "today, hundreds of thousands of families are finding it increasingly difficult to feed themselves properly." This is the first statement from the Catholic hierarchy since President Milei’s inauguration, days before his meeting with Pope Francis, born and lived in Argentina, reflecting the Church’s concern over the social crisis. (Maro Kouri/Polaris) (FOTO:DUKAS/POLARIS)

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_012
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431n)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_011
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431h)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_010
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431k)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_009
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431q)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_008
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431j)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_007
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431a)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_006
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431b)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_005
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431c)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_004
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431g)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_003
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431p)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_002
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431i)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    DUK10126126_001
    FEATURE - Kirche von Zhrebchevo in Bulgarien wird nach Austrocknung des Stausees restauriert
    Mandatory Credit: Photo by REX (10501431f)
    Workers have been restoring 'St Ivan Rilski' church, which had been under water for 60 years. After the sudden draining of the Zhrebchevo Dam, its restoration began. Currently, several cities in Bulgaria have difficulties with fresh water supply after the sudden drainage of several other dams.
    Church surfaces from dam drainage after 60 years, Zapalnya, Burlgaria - 10 Dec 2019

    (c) Dukas

     

  • NEWS - Thomas Cook: Ältester Reisekonzern der Welt ist pleite
    DUK10123487_026
    NEWS - Thomas Cook: Ältester Reisekonzern der Welt ist pleite
    Mandatory Credit: Photo by Amer Ghazzal/REX (10420816f)
    Check in counter of Thomas Cook airlines at Gatwick Airport as the tour operator faces financial difficulties with 150,000 passengers stranded abroad
    Thomas Cook Airlines crisis, London, UK - 22 Sep 2019

    (c) Dukas

     

  • NEWS - Thomas Cook: Ältester Reisekonzern der Welt ist pleite
    DUK10123487_020
    NEWS - Thomas Cook: Ältester Reisekonzern der Welt ist pleite
    Mandatory Credit: Photo by Amer Ghazzal/REX (10420816d)
    Check in counter of Thomas Cook airlines at Gatwick Airport as the tour operator faces financial difficulties with 150,000 passengers stranded abroad
    Thomas Cook Airlines crisis, London, UK - 22 Sep 2019

    (c) Dukas

     

  • NEWS - Thomas Cook: Ältester Reisekonzern der Welt ist pleite
    DUK10123487_017
    NEWS - Thomas Cook: Ältester Reisekonzern der Welt ist pleite
    Mandatory Credit: Photo by Amer Ghazzal/REX (10420816a)
    Check in counter of Thomas Cook airlines at Gatwick Airport as the tour operator faces financial difficulties with 150,000 passengers stranded abroad
    Thomas Cook Airlines crisis, London, UK - 22 Sep 2019

    (c) Dukas

     

  • FEATURE - Bilder des Tages
    DUK10078385_032
    FEATURE - Bilder des Tages
    November 20, 2017 - Turin, Piedmont, Italy - Turin, Italy - November 20, 2017: Evictions of migrants from the buildings of former Olympic Village Ex Moi in Turin, Italy (FOTO: DUKAS/ZUMA)
    (c) Dukas

     

  • NEWS - Nepal : Hochwasser nach starkem Regen in Kathmandu
    DUK10066513_008
    NEWS - Nepal : Hochwasser nach starkem Regen in Kathmandu
    July 14, 2017 - Kathmandu, Nepal - A man and a woman walk along a flooded road caused by heavy rainfall and poor sewage system at Gongabu in Kathmandu, Nepal on Friday, July 14, 2017 (FOTO: DUKAS/ZUMA)
    (c) Dukas

     

  • NEWS - Nepal : Hochwasser nach starkem Regen in Kathmandu
    DUK10066513_009
    NEWS - Nepal : Hochwasser nach starkem Regen in Kathmandu
    July 14, 2017 - Kathmandu, Nepal - Pedestrians struggle to get across a flooded road caused by heavy rainfall and poor sewage system at Gongabu in Kathmandu, Nepal on Friday, July 14, 2017 (FOTO: DUKAS/ZUMA)
    (c) Dukas

     

  • Nächste Seite